Residential Building Stages Inspection
Slab Inspection
- A slab inspection is critical because the slab forms the structural foundation of the home. In WA’s reactive soil conditions, proper preparation and reinforcement are essential to prevent future cracking and movement.
- A pre-pour inspection ensures compliance with the NCC, AS 2870, approved engineering plans, and confirms correct excavation, reinforcement placement, and moisture protection.
- Once concrete is poured, defects are difficult and costly to rectify. A professional slab inspection protects the structural integrity of the home and the homeowner’s investment from the very beginning.
- Limited Time: inspection start from $399
Book Your Home Inspection!
No Hidden Costs. Transparent Pricing. Trusted Local Experts.
- Free Quote
- Quick Response
Brickwork inspection
- Brickwork forms the structural backbone of most Western Australian homes. A professional brick stage inspection ensures the walls are straight, properly reinforced, and built in accordance with the NCC, AS 3700, and approved engineering plans.
- Early inspection helps identify issues such as missing wall ties, poor workmanship, incorrect lintel installation, and moisture protection defects before they are covered by roofing and internal finishes.
- A thorough brickwork inspection protects structural integrity, prevents costly future repairs, and gives homeowners confidence that their home is built to a high standard.
Roof Frame Inspection
When wall frames are up but before lining.
- A frame inspection verifies that the structural framework complies with the NCC, relevant Australian Standards, and approved engineering drawings before it is concealed.
- It ensures correct installation of wall frames, roof trusses, bracing, and tie-down connections. Early detection of defects at this stage prevents structural issues and costly rectification later in the construction process.
- Very important stage for structural compliance.
Roof cover Inspection
- A roof cover inspection is critical in Western Australia to ensure the roof is properly installed, weatherproof, and compliant before ceilings and internal finishes are completed. Given WA’s strong winds, coastal exposure, and heavy winter rains, even minor installation defects can lead to significant water ingress and long-term structural damage.
- Particular attention is given to flashings, valleys, gutters, and service penetrations to ensure they are sealed correctly and directing water away from the structure. Identifying issues at this stage prevents leaks, timber damage, ceiling staining, and costly rectification after completion.
Lock-Up Stage Inspection
- A lock-up inspection provides homeowners with independent assurance that the building envelope has been properly constructed before internal linings and finishes conceal critical components. At this stage, the roof cover, external walls, windows, doors, and structural connections should be complete, allowing a thorough assessment of workmanship and compliance.
- Check wet areas workmanship.
Practical Completion (PCI / Handover)
- A Practical Completion Inspection (PCI) is the final opportunity for the customer to ensure the home has been completed in accordance with the contract, approved plans, and relevant building standards before handover.
- This inspection identifies defects, incomplete works, and workmanship issues that should be rectified by the builder prior to final payment. It ensures finishes, fixtures, fittings, doors, windows, tiling, painting, and services are properly installed and functioning as intended.